Life Cycle Cost Analysis Example 01

Net Present Value Cost Calculation View

Totals

Introduction
This tool generates a variety of basic net present value statistics for DevTreks components and operations.

Calculation View Description
v210a

Version: 1.7.0

Feedback About commercial/componentgroup/Life Cycle Cost Analysis Example 01/657/componentnpvtotal1

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Display Full View:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions (beta)

Step 1

  • Step 1. The accompanying tutorial contains a reference that explains these analyzers.
  • Step 1. Base Calculations To Analyze: Make sure that the data being analyzed corresponds to outputs.
  • Step 1. Analysis Type:The Analysis Type that is saved should match the name of this analyzer.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
Life Cycle Cost Analysis Example 01
Component Group
 Life Cycle Cost Analysis Example 01 A10 09/28/2017
TAMOC TAMAOH TAMCAP TAMTOTAL TAMIncent
0.00 0.00 186,238.68 186,238.68 186,238.68
Component
 2007 Example 01 Slab on Grade A10301A 12/31/2007
TAMOC TAMAOH TAMCAP TAMTOTAL TAMIncent
0.00 0.00 58,650.13 58,650.13 58,650.13
TAMOC TAMAOH TAMCAP TAMTOTAL TAMIncent TOC P TOC Q TAOH P and Q TCAP P TCAP Q
Input:  NPS 2007, Concrete Waste Factor 10% 03.30.53 01/10/2007
0.00 0.00 24,225.95 24,225.95 24,225.95 0.00 0.00 0.00;0.00 235.30 100.00
Input:  NPS 2007, F I Crushed Aggregate Base - 6- 31.23.23 01/10/2007
0.00 0.00 5,747.10 5,747.10 5,747.10 0.00 0.00 0.00;0.00 55.82 100.00
Input:  NPS 2007, F I Rigid EPS and Vapor Barrier 07.27.13 01/10/2007
0.00 0.00 1,595.84 1,595.84 1,595.84 0.00 0.00 0.00;0.00 1.55 1,000.00
Input:  NPS 2007, Fine Grade Install 4- leveling sand 31.23.23 01/10/2007
0.00 0.00 2,059.15 2,059.15 2,059.15 0.00 0.00 0.00;0.00 2.00 1,000.00
Input:  NPS 2007, Furnish Install Pre-stressing Tendon 03.23.05 01/10/2007
0.00 0.00 1,214.90 1,214.90 1,214.90 0.00 0.00 0.00;0.00 1.18 1,000.00
Input:  NPS 2007, Misc- STS -cure, etc-- 03.39.23 01/10/2007
0.00 0.00 782.48 782.48 782.48 0.00 0.00 0.00;0.00 152.00 5.00
Input:  NPS 2007, Power trowel finish 03.35.22 01/10/2007
0.00 0.00 617.75 617.75 617.75 0.00 0.00 0.00;0.00 0.60 1,000.00
Input:  NPS 2007, F I Supplemental Reinforcing Mesh 03.23.05 01/10/2007
0.00 0.00 658.93 658.93 658.93 0.00 0.00 0.00;0.00 0.64 1,000.00
Input:  NPS 2007, Furnish Pour concrete 03.30.53 01/11/2007
0.00 0.00 21,748.03 21,748.03 21,748.03 0.00 0.00 0.00;0.00 211.25 100.00
Component
 2007 Example 02 Slab on Grade A10301B 12/31/2007
TAMOC TAMAOH TAMCAP TAMTOTAL TAMIncent
0.00 0.00 37,320.93 37,320.93 37,320.93
TAMOC TAMAOH TAMCAP TAMTOTAL TAMIncent TOC P TOC Q TAOH P and Q TCAP P TCAP Q
Input:  NPS 2007, Concrete Waste Factor 10% 03.30.53 01/10/2007
0.00 0.00 242.26 242.26 242.26 0.00 0.00 0.00;0.00 235.30 1.00
Input:  NPS 2007, F I Crushed Aggregate Base - 6- 31.23.23 01/10/2007
0.00 0.00 6,321.81 6,321.81 6,321.81 0.00 0.00 0.00;0.00 55.82 110.00
Input:  NPS 2007, F I Rigid EPS and Vapor Barrier 07.27.13 01/10/2007
0.00 0.00 1,611.80 1,611.80 1,611.80 0.00 0.00 0.00;0.00 1.55 1,010.00
Input:  NPS 2007, Fine Grade Install 4- leveling sand 31.23.23 01/10/2007
0.00 0.00 2,079.75 2,079.75 2,079.75 0.00 0.00 0.00;0.00 2.00 1,010.00
Input:  NPS 2007, Furnish Install Pre-stressing Tendon 03.23.05 01/10/2007
0.00 0.00 1,227.05 1,227.05 1,227.05 0.00 0.00 0.00;0.00 1.18 1,010.00
Input:  NPS 2007, Misc- STS -cure, etc-- 03.39.23 01/10/2007
0.00 0.00 625.98 625.98 625.98 0.00 0.00 0.00;0.00 152.00 4.00
Input:  NPS 2007, Power trowel finish 03.35.22 01/10/2007
0.00 0.00 623.92 623.92 623.92 0.00 0.00 0.00;0.00 0.60 1,010.00
Input:  NPS 2007, F I Supplemental Reinforcing Mesh 03.23.05 01/10/2007
0.00 0.00 665.52 665.52 665.52 0.00 0.00 0.00;0.00 0.64 1,010.00
Input:  NPS 2007, Furnish Pour concrete 03.30.53 01/11/2007
0.00 0.00 23,922.83 23,922.83 23,922.83 0.00 0.00 0.00;0.00 211.25 110.00
Component
 2008 Example 01 Slab on Grade A10301A 12/31/2008
TAMOC TAMAOH TAMCAP TAMTOTAL TAMIncent
0.00 0.00 31,442.77 31,442.77 31,442.77
TAMOC TAMAOH TAMCAP TAMTOTAL TAMIncent TOC P TOC Q TAOH P and Q TCAP P TCAP Q
Input:  NPS 2008, Concrete Waste Factor 10% 03.30.53 01/10/2008
0.00 0.00 1,466.03 1,466.03 1,466.03 0.00 0.00 0.00;0.00 237.30 6.00
Input:  NPS 2008, F I Crushed Aggregate Base - 6- 31.23.23 01/10/2008
0.00 0.00 405.93 405.93 405.93 0.00 0.00 0.00;0.00 56.32 7.00
Input:  NPS 2008, F I Rigid EPS and Vapor Barrier 07.27.13 01/10/2008
0.00 0.00 1,580.02 1,580.02 1,580.02 0.00 0.00 0.00;0.00 1.55 990.00
Input:  NPS 2008, F I Supplemental Reinforcing Mesh 03.23.05 01/10/2008
0.00 0.00 642.20 642.20 642.20 0.00 0.00 0.00;0.00 0.63 990.00
Input:  NPS 2008, Fine Grade Install 4- leveling sand 31.23.23 01/10/2008
0.00 0.00 1,957.18 1,957.18 1,957.18 0.00 0.00 0.00;0.00 1.92 990.00
Input:  NPS 2008, Furnish Install Pre-stressing Tendon 03.23.05 01/10/2008
0.00 0.00 1,192.66 1,192.66 1,192.66 0.00 0.00 0.00;0.00 1.17 990.00
Input:  NPS 2008, Misc- STS -cure, etc-- 03.39.23 01/10/2008
0.00 0.00 1,106.37 1,106.37 1,106.37 0.00 0.00 0.00;0.00 153.50 7.00
Input:  NPS 2008, Power trowel finish 03.35.22 01/10/2008
0.00 0.00 591.23 591.23 591.23 0.00 0.00 0.00;0.00 0.58 990.00
Input:  NPS 2008, Furnish Pour concrete 03.30.53 01/11/2008
0.00 0.00 22,501.15 22,501.15 22,501.15 0.00 0.00 0.00;0.00 204.25 107.00
Component
 2008 Example 02 Slab on Grade A10301B 12/31/2008
TAMOC TAMAOH TAMCAP TAMTOTAL TAMIncent
0.00 0.00 34,893.83 34,893.83 34,893.83
TAMOC TAMAOH TAMCAP TAMTOTAL TAMIncent TOC P TOC Q TAOH P and Q TCAP P TCAP Q
Input:  NPS 2008, Concrete Waste Factor 10% 03.30.53 01/10/2008
0.00 0.00 733.02 733.02 733.02 0.00 0.00 0.00;0.00 237.30 3.00
Input:  NPS 2008, F I Crushed Aggregate Base - 6- 31.23.23 01/10/2008
0.00 0.00 5,973.03 5,973.03 5,973.03 0.00 0.00 0.00;0.00 56.32 103.00
Input:  NPS 2008, F I Rigid EPS and Vapor Barrier 07.27.13 01/10/2008
0.00 0.00 1,603.96 1,603.96 1,603.96 0.00 0.00 0.00;0.00 1.55 1,005.00
Input:  NPS 2008, F I Supplemental Reinforcing Mesh 03.23.05 01/10/2008
0.00 0.00 651.93 651.93 651.93 0.00 0.00 0.00;0.00 0.63 1,005.00
Input:  NPS 2008, Fine Grade Install 4- leveling sand 31.23.23 01/10/2008
0.00 0.00 1,986.84 1,986.84 1,986.84 0.00 0.00 0.00;0.00 1.92 1,005.00
Input:  NPS 2008, Furnish Install Pre-stressing Tendon 03.23.05 01/10/2008
0.00 0.00 1,210.73 1,210.73 1,210.73 0.00 0.00 0.00;0.00 1.17 1,005.00
Input:  NPS 2008, Misc- STS -cure, etc-- 03.39.23 01/10/2008
0.00 0.00 474.16 474.16 474.16 0.00 0.00 0.00;0.00 153.50 3.00
Input:  NPS 2008, Power trowel finish 03.35.22 01/10/2008
0.00 0.00 600.19 600.19 600.19 0.00 0.00 0.00;0.00 0.58 1,005.00
Input:  NPS 2008, Furnish Pour concrete 03.30.53 01/11/2008
0.00 0.00 21,659.99 21,659.99 21,659.99 0.00 0.00 0.00;0.00 204.25 103.00
Component
 2009 Example 01 Slab on Grade A10301A 12/31/2009
TAMOC TAMAOH TAMCAP TAMTOTAL TAMIncent
0.00 0.00 0.00 0.00 0.00
TAMOC TAMAOH TAMCAP TAMTOTAL TAMIncent TOC P TOC Q TAOH P and Q TCAP P TCAP Q
Input:  NPS 2009, Concrete Waste Factor 10% 03.30.53 01/10/2009
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00;0.00 240.30 0.00
Input:  NPS 2009, F I Crushed Aggregate Base - 6- 31.23.23 01/10/2009
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00;0.00 57.57 0.00
Input:  NPS 2009, F I Rigid EPS and Vapor Barrier 07.27.13 01/10/2009
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00;0.00 1.54 0.00
Input:  NPS 2009, F I Supplemental Reinforcing Mesh 03.23.05 01/10/2009
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00;0.00 0.62 0.00
Input:  NPS 2009, Fine Grade Install 4- leveling sand 31.23.23 01/10/2009
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00;0.00 1.89 0.00
Input:  NPS 2009, Furnish Install Pre-stressing Tendon 03.23.05 01/10/2009
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00;0.00 1.20 0.00
Input:  NPS 2009, Misc- STS -cure, etc-- 03.39.23 01/10/2009
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00;0.00 158.00 0.00
Input:  NPS 2009, Power trowel finish 03.35.22 01/10/2009
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00;0.00 0.64 0.00
Input:  NPS 2009, Furnish Pour concrete 03.30.53 01/11/2009
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00;0.00 215.81 0.00
Component
 2009 Example 02 Slab on Grade A10301B 12/31/2009
TAMOC TAMAOH TAMCAP TAMTOTAL TAMIncent
0.00 0.00 23,931.02 23,931.02 23,931.02
TAMOC TAMAOH TAMCAP TAMTOTAL TAMIncent TOC P TOC Q TAOH P and Q TCAP P TCAP Q
Input:  NPS 2009, Concrete Waste Factor 10% 03.30.53 01/10/2009
0.00 0.00 618.52 618.52 618.52 0.00 0.00 0.00;0.00 240.30 2.50
Input:  NPS 2009, F I Crushed Aggregate Base - 6- 31.23.23 01/10/2009
0.00 0.00 148.19 148.19 148.18 0.00 0.00 0.00;0.00 57.57 2.50
Input:  NPS 2009, F I Rigid EPS and Vapor Barrier 07.27.13 01/10/2009
0.00 0.00 1,593.48 1,593.48 1,593.48 0.00 0.00 0.00;0.00 1.54 1,005.00
Input:  NPS 2009, F I Supplemental Reinforcing Mesh 03.23.05 01/10/2009
0.00 0.00 641.53 641.53 641.53 0.00 0.00 0.00;0.00 0.62 1,005.00
Input:  NPS 2009, Fine Grade Install 4- leveling sand 31.23.23 01/10/2009
0.00 0.00 1,955.63 1,955.63 1,955.63 0.00 0.00 0.00;0.00 1.89 1,005.00
Input:  NPS 2009, Furnish Install Pre-stressing Tendon 03.23.05 01/10/2009
0.00 0.00 1,241.67 1,241.67 1,241.67 0.00 0.00 0.00;0.00 1.20 1,005.00
Input:  NPS 2009, Misc- STS -cure, etc-- 03.39.23 01/10/2009
0.00 0.00 406.68 406.68 406.68 0.00 0.00 0.00;0.00 158.00 2.50
Input:  NPS 2009, Power trowel finish 03.35.22 01/10/2009
0.00 0.00 662.22 662.22 662.22 0.00 0.00 0.00;0.00 0.64 1,005.00
Input:  NPS 2009, Furnish Pour concrete 03.30.53 01/11/2009
0.00 0.00 16,663.11 16,663.11 16,663.11 0.00 0.00 0.00;0.00 215.81 75.00
Dataset: Life Cycle Cost Analysis Example 01 IRI This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.